Remediation of three environmental hot spots in BiH - Results PDF
Remediation of three environmental hot spots in BiH - ResultsThis is the main component of the programme and based on the more detailed information submitted by the local authorities and/or site owners about the potential project sites and the interest expressed, three particular hot spots were selected through consultation between the UNDP, relevant national authorities, the Embassy of the Netherlands in BiH and the civil society:

- University Clinic Center, Gradina, Tuzla
- Hospital for Pulmonary Diseases and Tuberculoses, Slavinovici, Tuzla
- Local Community of Dragodol/Tusanj, Tuzla

The priority has been given to Tuzla municipality as one of the most polluted, not only in BiH, but in the region as well with trans-boundary effect. Analysis of air quality from automatic network of measuring stations in Tuzla has shown that the air quality in Tuzla is very poor and that types of project such as connecting the two hospitals and Dragodol community into the district heating from the Tuzla Thermal Power Plant’s heat transmission system is justifiable and preferred. Heating system in both hospitals was based on coal fired boilers - source of pollution in very center of Tuzla City, while a community of Dragodol/Tusanj is covered by individual and separated residential heating systems. During the heating season, the total emission of SO2 from these three hot spots amounts to app 258 tons, 77 tons of NOX, 165 tons of particulates, and 16 730 tons of CO2 . Total consumption of coal by the two hospitals is 11,000 tons per year and they generate approximately 2,000 m3 of slag and ash per year. The coal used has the highest sulphur content of all coals sourced in BiH. Coal’s’ total sulphur content is approximately 2.3% mass, of which approximately 1.5% is combustible. In order to eliminate above specified emission of gases, central heating system in two hospitals has been completely restructured and connected to district heating system for winter season heating and winter season sanitary hot water. Coal based boilers have been turned into natural gas boilers for supply of whole year steam, non-winter season sanitary hot water, serve as secondary heating system in case of district heating malfunction. Collective residential units with 650 household in a local Community of Dragodol/ Tusanj have been connected to district heating system (additional 100 individual residential units can be connected to new network). With the above works, described sources of air pollution at Gradina and Slavinovici hospitals have been completely eliminated and significantly decreased in Dragodol.

Bill of Quantities for all three project can be downloaded from following links:
pdf Bill of Quantities - University Clinic Center, Gradina, Tuzla
pdf Bill of Quantities - Hospital for Pulmonary Diseases and Tuberculoses, Slavinovici, Tuzla
pdf Bill of Quantities - Local Community of Dragodol/Tusanj, Tuzla
 
 
Next >
experts_logo.png

About Project

The goal of the 30 months Programme is to improve the environmental situation and quality of life for citizens living in and around polluted areas in the most economical way.karta_mala.gif Vrbas ugljevik tuzla mojkovac bajza Trebca Lojane Bucim

albania-bajza.jpg Bajza - Albania
Clean up the stockpile
of toxic chemicals
albania-bajza.jpg Balez, Elbasan-Albania
clean up the stockpile
of chemical waste
albania-bajza.jpg Reps - Albania
rehabilitation of mine tailing facility
albania-bajza.jpg Rreshen - Albania
rehabilitation of mine tailing facility
bih-tuzla.jpg Tuzla - BiH
Reducing the air-polution
macedonia-bucim.jpg Bucim - Macedonia
Prevention of the future pollution
macedonia-lojane.jpg Lojane - Macedonia
Removal of hazardous waste
montenegro-mojkovac.jpg Mojkovac - Montenegro
Cleaning up the Tailing Mine Impoundment
serbia-vrbas.jpg Vrbas - Serbia
construction of the main waste water collector
kosovo_artana.jpg Trepca, Artana - Kosovo
rehabilitation of mine tailing facility 
kosovo_stari_trg.jpg Trepca, Stari Trg- Kosovo
rehabilitation of mine tailing facility 
You are here  :Regional Office arrow Bosnia and Herzegovina